Project List

Here's a working list of all the projects we've undertaken since day one, and how things are looking now. 

Front Exterior
To date:
  • Removed ivy growing on exterior
  • Removed old porch awning and railings
  • New paint on the windows and door
  • In 2014, we began work on a complete exterior facelift (aka we added a second story occupying the footprint of the attic with a large shed dormer on the rear of the house, a new gable over the front door and front right window, new sunroom exterior and a larger center gable). 


Living Room
To date:
  • Refinished hardwoods
  • Serviced chimney / fireplace 
  •  New paint
  • New ceiling, with overhead lights (6 canned)
  • Touched up plaster and paint on walls
Dining Room
To date:
  • Refinished hardwoods
  • Repaired door to sunporch
  • Removed swinging door to kitchen
  • New paint 


 Kitchen


To date:
  • Removed old flooring (original linoleum), installed new to match existing in rest of the house
  • Removed everything below existing upper cabinets, down to the studs (due to mold issues)
  •  Updated electrical throughout 
  • Removed cabinet doors from uppers along wall with sink
  • Installed new sink and appliances
  • Built custom lower cabinets (all Shannon) to match existing
  • New paint on walls, ceiling, cabinets
  • Seating for a breakfast nook 
In the works:
  • Install backsplash 
First Floor Bathroom




To date:
  • Removed old sink and toilet
  • Resurfaced tub 
  • Installed new vanity with sink
  • Installed new showerhead
  • Regrouted shower tile
  • Installed new wainscoting and trim throughout
  • Built custom mirror from old window
  • Installed lighting
  • Installed fan
 Downstairs Bedroom

  • Purely cosmetic - refinished floor, patched and painted walls, installed new lighting 







Downstairs Office 

  • Purely cosmetic - refinished floor, patched and painted walls, installed new lighting 


 





Deck
To date: 
  • Stripped old green paint
  • Removed old screen and wall frames
  • Removed dangerous stairs
  • Built new railings and stairs
  • Stained platform with grey wood stain

Sunroom

  • Built 3 walls and installed new windows
  • Stripped and stained cocnrete floor
  • Painted walls and ceiling







     

Basement
To date: 
  • Re-plumbed entire house
  • Installed new vents for A/C
  • Dug out dirt floors and walls beyond existing concrete pad
  • Installed french drains and vapor barrier
  • Poured new floor and walls 
In the works
  • Install a utility bathroom (read: for boys only) 
  • Organize storage

Attic
To date: 
  • Demo-ed entire upstairs to prepare for renovation
  • Ripped up old flooring, removed interior walls and laid out rough-in for new bathroom
  • Added a rear dormer and front gables / dormers in winter/spring 2014 
  • Buildout includes our new master suite, including bedroom with sitting area, bathroom, and closet, as well as a common area we're calling the library. Because we're fancy.  

No comments: