Here's a working list of all the projects we've undertaken since day one, and how things are looking now.
Front Exterior
To date:
Living Room
To date:
To date:
Kitchen
To date:
First Floor Bathroom
To date:
Downstairs Office
Deck
To date:
Front Exterior
- Removed ivy growing on exterior
- Removed old porch awning and railings
- New paint on the windows and door
- In 2014, we began work on a complete exterior facelift (aka we added a second story occupying the footprint of the attic with a large shed dormer on the rear of the house, a new gable over the front door and front right window, new sunroom exterior and a larger center gable).
Living Room
To date:
- Refinished hardwoods
- Serviced chimney / fireplace
- New paint
- New ceiling, with overhead lights (6 canned)
- Touched up plaster and paint on walls
To date:
- Refinished hardwoods
- Repaired door to sunporch
- Removed swinging door to kitchen
- New paint
Kitchen
To date:
- Removed old flooring (original linoleum), installed new to match existing in rest of the house
- Removed everything below existing upper cabinets, down to the studs (due to mold issues)
- Updated electrical throughout
- Removed cabinet doors from uppers along wall with sink
- Installed new sink and appliances
- Built custom lower cabinets (all Shannon) to match existing
- New paint on walls, ceiling, cabinets
- Seating for a breakfast nook
- Install backsplash
To date:
- Removed old sink and toilet
- Resurfaced tub
- Installed new vanity with sink
- Installed new showerhead
- Regrouted shower tile
- Installed new wainscoting and trim throughout
- Built custom mirror from old window
- Installed lighting
- Installed fan
- Purely cosmetic - refinished floor, patched and painted walls, installed new lighting
Downstairs Office
- Purely cosmetic - refinished floor, patched and painted walls, installed new lighting
Deck
To date:
- Stripped old green paint
- Removed old screen and wall frames
- Removed dangerous stairs
- Built new railings and stairs
- Stained platform with grey wood stain
Sunroom
Basement
To date:
Attic
To date:
- Built 3 walls and installed new windows
- Stripped and stained cocnrete floor
- Painted walls and ceiling
Basement
To date:
- Re-plumbed entire house
- Installed new vents for A/C
- Dug out dirt floors and walls beyond existing concrete pad
- Installed french drains and vapor barrier
- Poured new floor and walls
- Install a utility bathroom (read: for boys only)
- Organize storage
Attic
To date:
- Demo-ed entire upstairs to prepare for renovation
- Ripped up old flooring, removed interior walls and laid out rough-in for new bathroom
- Added a rear dormer and front gables / dormers in winter/spring 2014
- Buildout includes our new master suite, including bedroom with sitting area, bathroom, and closet, as well as a common area we're calling the library. Because we're fancy.